The erosion also damaged the foundation of the adjacent residential building, so the THW Detmold and a technical advisor from the THW Halle were called to the scene to check the structural stability. The structural stability of the building was checked by the technical advisor from the THW.
During the course of the operation, no further sinking of the soil was observed, so the operation for the fire department and the THW was ended after approximately 3 hours.
The Hagen unit, the A-Service, as well as the THW Detmold and Halle were in action.
The Hagen unit was back at the scene for a check on Sunday afternoon (19.01.2025). No further changes were observed.
For inquiries, please contact:
Volunteer Fire Department Lage
Andreas Dieckmann
Email: pressesprecher@feuerwehr-lage.org
http://www.feuerwehr-lage.org
Original content from: Volunteer Fire Department Lage, transmitted by news aktuell
Latest Posts

17.01.2025 14:30
Landau - Forgot to turn off the stove

16.01.2025 15:59
Press release from the SZ/PE/WF Police Inspection on 16.01.2025

18.01.2025 07:54
On a thieving tour with a prepared bag

16.01.2025 15:31
Segeberg District - Traffic accident on Federal Highway 206

16.01.2025 14:56
Temporary closure of the service building in Bad Gandersheim

17.01.2025 14:00
Comments